Practical Shutdown and Turnaround Management for Engineers and Managers (SH)
This workshop gives you an excellent review of shutdown management from the perspective of someone who has done it from the trenches.
There are many case studies of successful shutdown projects to ensure that you get the latest and most up to date information to successfully apply to your next project - no matter what position you hold.
The engineering world is littered with examples of poor shutdowns with massive overruns in costs and problems in resource planning.
Performing an effective shutdown is an example of applying many of the principles of good Project Management with some important exceptions; these are outlined in the workshop.
At the end of this workshop participants will be able to:
- Describe typical turnaround management techniques
- Coordinate a simple turnaround project from planning to execution and hand-over
- Coordinate the personnel in a shutdown and turnaround project
- Apply shutdown best practices and planning
- Build an effective Maintenance project plan for Shutdowns
- Use Critical paths to identify risks and manage these risk effectively
- Plan to meet deadlines and complete Turnaround projects within budget and on time
- Manage resources effectively on a turnaround project
- Develop the personal skills critical to effective Turnaround project management
- Organise and improve performance to create a productive and competent team
- Evaluate and make immediate use of Turnaround Project Management Software packages
WHO SHOULD ATTEND?
- Construction superintendents
- Cost control staff
- Engineering professionals
- Maintenance planning managers
- Maintenance/supervisory managers
- Project engineers
- Project team members in: manufacturing, process industries, research and development, utilities, local authorities
- Shutdown managers and coordinators
- Technical personnel
CONTENT SUMMARY
FUNDAMENTALS OF SHUTDOWNS AND TURNAROUNDS
- Overview and introduction
- Structure of shutdown plan
- Critical ingredients of good shutdown management
- Typical problems
- Coordination issues
- Success stories
- Not so successful stories
PLANNING AND SCHEDULING
- Management plan and procedures
- Scheduling maintenance activities
- Monitoring and control techniques
- Backlog management techniques
- Planning for the shutdown
- The actual shutdown
- Post shutdown
MAINTENANCE CONCEPTS
- Measurement and improvement of maintenance performance
- Maintenance audits
HUMAN RESOURCES
- Management of contractors, incentives and claims
- Variations to claims
- Liaison between teams
- Organisational charts
- Motivation and team building
- Training of contractors
- Quality control of human resources
MATERIALS AND EQUIPMENT PLANNING
- Definition of equipment and materials
- Interfaces between different equipment packages
- Long lead times
- Off site construction and suppliers
- Variations to scope
PRINCIPLES OF ENGINEERING PROJECT MANAGEMENT FOR SHUTDOWNS
- Overview of the project environment
- Project life cycle and phases
- Project organisations and definitions
Case Study: an exercise in developing a work breakdown structure
TIME MANAGEMENT OF SHUTDOWNS
- Critical path and precedence method of schedule analysis
- Presentation of the schedules
- Resource analysis
- Monitoring and reporting achieved progress
- Selection of software
Case Study: application of the precedence method analysis technique
COST MANAGEMENT OF SHUTDOWNS
- Cost estimation
- Budget preparation
- Financial and change control
- Cost reporting
- Value management
Case Study: preparation of a project cost report
RISK MANAGEMENT OF SHUTDOWNS
- Risk management defined
- Risk identification, analysis and management responses
QUALITY IN SHUTDOWN MANAGEMENT
- Definition of quality and management
- Quality program
- Project quality assurance
- Quality procedures
- ISO 9000
INTRODUCTION TO CONTRACT LAW ON SHUTDOWNS
- Legal system
- Essential elements of contracts
- Factors destroying the legal force of contracts
- Termination of contracts
- Breach of contracts
- Liquidated damages
- Techniques to ensure completion of shutdown contracts without “going legal”
PROJECT PLANNING SESSION
Work in teams to develop and document an outline project plan for a defined shutdown project.
CASE STUDIES
- Manufacturing plant
- Offshore platform
- Oil refinery
- Power plant
CONCLUSION
- After the shutdown – continuous improvement
- Elimination of problems and bottlenecks
- Planning the next shutdown – retaining data